1. <p id="kxttw"></p>
      <td id="kxttw"><option id="kxttw"></option></td><p id="kxttw"><strong id="kxttw"><xmp id="kxttw"></xmp></strong></p>
      1. <acronym id="kxttw"><strong id="kxttw"><listing id="kxttw"></listing></strong></acronym><pre id="kxttw"><ruby id="kxttw"></ruby></pre>
        Group News
        The Group Held a Detailed Geological Report Review Meeting for Uganda Salt Mine Project
        Source: 原創     Time:2019-08-15       Publisher:admin
        Share:

        新浪微博

        朋友圈

        QQ空間

        豆瓣網

        QQ好友

        On August 10, 2019, the group held a review meeting on detailed geological report for salt mine project of Uganda Rwenzori Shining Star co., LTD. The meeting was presided over by Ma Jinkui, chief engineer of Uganda salt mine project. Yan Yu, chairman, Wang Hailong, vice president and other leaders of the group attended the meeting.

        Liu Chenglin, Chinese academy of geological sciences researcher at the institute of mineral resources, Hu Shuya, processing design director and Hu Hanyue, mining design director of China Tianchen Engineering Corporation (TCC), Li Canxian, chief engineer of Shenzhen Zhong Hang Resources Co., LTD, Yan Sujuan, deputy general manager of Kunming Zhonghang Phosphorus Chemical co., LTD, and Wu Shengbin, mining design director of China Blue Star Changsha Design and Research Institute (China Blue Star Changsha Engineering Technology Co., LTD) etc. experts invited to attend the meeting. At the meeting, the expert group listened to the detailed geological report of Uganda salt mine project submitted by Changsha Light Industry and China Survey & Design Institute, and review the report.

        During the review meeting, first of all, the panel of experts to the Uganda salt mine project detailed geological report gave full affirmation, the survey results are reasonable, scientific and authenticity, but also there are many problems. After the review meeting, the expert group conducted in-depth research and discussion with the leaders of the group and the project team on the product plan and mining plan.


        At the end, Yan Yu, chairman of the group proposed new ideas on the market situation, development mode, product positioning and overall planning and operation of the Uganda salt mine project from the overall perspective of the project, and communicated with the experts.
        The review meeting of Uganda salt mine project has preliminarily defined the development value of the project, mining scheme and implementation path, which has important guiding significance for the project to enter the next stage.

        Shining Star Group @All Rights Reserved 滇ICP備10200980號-4  滇公網安備53011102000829號
        Technical support:AYKJ
        99精品女人在线观看免费视频|国产色诱视频在线播放丝袜|在线观看无码视频|超清乱人伦中文视频在线
        1. <p id="kxttw"></p>
          <td id="kxttw"><option id="kxttw"></option></td><p id="kxttw"><strong id="kxttw"><xmp id="kxttw"></xmp></strong></p>
          1. <acronym id="kxttw"><strong id="kxttw"><listing id="kxttw"></listing></strong></acronym><pre id="kxttw"><ruby id="kxttw"></ruby></pre>